So far I have ordered a few things for the 300 gallon tank I am getting but today was the first day of work. I gave my dad a call this morning and asked if he wanted to come and give me a hand building the stand. We made a trip to Lowe's where I spent $160 for wood, nails, and foam.
We managed to get everything done exept for the doors, trim, and paint. I also still need to put the sides on the tank, I'm going to wait until I finish the sump before I put those on so I can slide the sump in. All considering I would say it was a pretty productive day considering it was around 37 degrees and I can barely walk due to knee surgery. I am paying for it now though, my knee is swollen pretty bad.
Anyway, here are some progress pictures. It is amazing how much this stand weighs!
We managed to get everything done exept for the doors, trim, and paint. I also still need to put the sides on the tank, I'm going to wait until I finish the sump before I put those on so I can slide the sump in. All considering I would say it was a pretty productive day considering it was around 37 degrees and I can barely walk due to knee surgery. I am paying for it now though, my knee is swollen pretty bad.
Anyway, here are some progress pictures. It is amazing how much this stand weighs!