Would I be able to do 2 open drains fully submerged (one on each corner flowt), 1 emergency drain and use the other hole in that corner overflow to do the return instead of running 2 full separate Herbies or this wouldn't work1200gph at the output would be the highest. I have a thread but very little pics of plumbing. ragin_cajun gots the info!