Hi guys first time poster here.
Long story short, I've built an Overflow apparatus using PVC, with the weir for in-tank level method. Problem is, its literally trickling. Ive only cemented the U joints for now, as I adjust for decent flow before I lock it in.
Whats missing from the photo is a PVC pipe point upwards tallers then the rest. Which I fill up with water to prime using the method seen in King of DIYS vid, block the outflow, fill up the pipe, then release the outflow.
Ive fiddled around with it, and I can sort of stop and restart the flow. So im guessing somethings right.
My theory is maybe the levels of my bends are wrong?
Find attached the Design and a photo of it.


Long story short, I've built an Overflow apparatus using PVC, with the weir for in-tank level method. Problem is, its literally trickling. Ive only cemented the U joints for now, as I adjust for decent flow before I lock it in.
Whats missing from the photo is a PVC pipe point upwards tallers then the rest. Which I fill up with water to prime using the method seen in King of DIYS vid, block the outflow, fill up the pipe, then release the outflow.
Ive fiddled around with it, and I can sort of stop and restart the flow. So im guessing somethings right.
My theory is maybe the levels of my bends are wrong?
Find attached the Design and a photo of it.


