I just bought a used 270g tank with center overflow. Took some pics of previous owner’s setup and plumbing. I wanted to know if its all correct or better way to do it.
Within the bulkhead, there’s three durso style drains with U. I was thinking two should be drainsge snd third for emergency or deleting it. (See pic)
then comes plumbing. Its got two returns, both goes spray bar. The other three in the pics is drains.
any tips or help on replumbing this. I was think drains will gate valves & unions. Return will have just check valve and union
Within the bulkhead, there’s three durso style drains with U. I was thinking two should be drainsge snd third for emergency or deleting it. (See pic)
then comes plumbing. Its got two returns, both goes spray bar. The other three in the pics is drains.