With a weir, yes. Herbie overflow (so a durso and a stand pipe), 1 emergency above water level, 1 return (with 2 locline), 1 drain directly to house plumbing for water change purposes. Everything with ball valve.are you planning on running the bulk heads on just one end?
Everything will be waterproofed. This is just part 1, frame. Im no where near finish. Just posted what i did this morning.Osb will cause swell when it gets wet.
How big!? For this build, i have a 55 g, glass though.Looks good, I am building a acrylic sump soon I hope. Cut most of the pieces last week. Waiting for some weld on 40. To arrive.
47x 18 x 22 it's a old 3/8" thick 90 gal tank getting the saw.How big!? For this build, i have a 55 g, glass though.