The plumbing as started
To much work
one of the holes prepared for the plumbing system
Here with water and runing. This is provisory because the plumbing system is drying.
There's still a lot of work to do Only 4 tanks are running. This is just the begining and not done yet.
This 4 tanks have 2 x 150*80*50cm = 600lt each and 2 x 130*80*50cm = 520lt each
To much work
one of the holes prepared for the plumbing system
Here with water and runing. This is provisory because the plumbing system is drying.
There's still a lot of work to do Only 4 tanks are running. This is just the begining and not done yet.
This 4 tanks have 2 x 150*80*50cm = 600lt each and 2 x 130*80*50cm = 520lt each