The tanks have been drilled, the plastic was ordered and will be in 2 fridays from today. Probably a week before we can cut it... I really need a table saw for that part. At any rate it will be wrapping up overflow modification mid july. Plugging the tanks back into the super system will be a breeze then its time to sort the DE filter/pump situation out. I want to run the system for a month as it was last setup when you guys saw it to get whatever out of the pipes and tanks then plug in the final pump and DE filter. I imagine we will be putting stock in the tanks some time this fall.