After a long hiatus of a whole lot of nothing, plans are moving forward.
First, the downstairs projects. The kitchenette cabinets and new faucet will be installed very soon. Likely a one day job (only 3 cabinets with the new faucet and basket).
Next up will be the fish room renovation/repair completion. Want to get everything wrapped up by late January probably sooner.
Other repair projects completed: rotted out and leaking kitchen disposal replaced (nothing like a kitchen pool at 2am). Dishwasher door cables will be replaced over the pulleys so the door stops crashing open. That will be done next week.
I will be moving Kong and Tango's tanks out of the fishroom temporarily for renovation access. Kong's wood stand is showing a bit of space between the tabletop boards likely caused by shrinkage from dryer air. Don't like that.
I will be glad to get this stuff done so the basement can have some order again. And then...concentrate of the cube tank project.
Haven't donated the hrp babies yet due to the cold weather but that's on the agenda too. The wood stand
Backfromthedead
built for me will be going in my office space where intended. Later I will start painting it when everything else settles down.
I'm off the next few days so I'll be getting the wood planks for the metal stands as well.