Completed the top braces, then installed the windows.
Will be tricky to continue with all the window braces, but I have 3 weeks until the fill test so I will be working on the other parts of the build while I wait.
What is left?
Upper walls need to be built. These will support the Drywall on the finished side. And fiberglass panels on the tank side which will be used to contain the jumpers and the moisture because I am not going to have covers over the tank this time. When I get to that stage it will be more clear what I am doing.
Plumbing needs to be done after that.
Install the lighting (Still deciding on that) It's a tossup between spot lights and suspended fluorescent fixtures.
Your house is going to tip over! I'm seriously doing this when I get my own place. Maybe not quite as large though haha. Truly an epic build! I'm hooked!
LOL I can see the exhaust fan in the window, I bet it stinks in there!
So your going with a sump instead of the Ultima sand/bead type fillter or both? Is the sump going to be on the left side there with all the intake/return holes?
Again, great progress!