close.....Nic;1559734; said:is it running yet?????
finish wiring the circulation pump
finish plumbing the pump return lines
finish plumbing the filtered water return lines
at this point the filter can be filled and its cycle begun
then i need to plumb the tank water feed to the filter
and the dosing pump for continuous carbon feed for the anoxic BB