• We are currently upgrading MFK. thanks! -neo

ZENNZZO's duce duce five...

zennzzo;2956692; said:
Camera is MIA...LLLOOOOOONNNNNG day...like it is still Friday...

Have you ever worked so hard on something that it seems it will never get done?

I have been busy like a MoFo and it seems that I can't get to everything I want to get done...


Have you seen my basement? LOL

Your making headway though. Keep it up.
 
Pharaoh;2956926; said:
Have you seen my basement? LOL

Your making headway though. Keep it up.
I need need need 2 1.5" bulkheads slip on the flange and FPT on the nut side....STAT!!♦
:cry::cry::cry:
 
zennzzo;2957300; said:
I need need need 2 1.5" bulkheads slip on the flange and FPT on the nut side....STAT!!♦
:cry::cry::cry:

Those are probably going to be harder to come by. Probably an on-line order for sure.
 
Pharaoh;2957391; said:
Those are probably going to be harder to come by. Probably an on-line order for sure.
The only 2 pieces of used plumbing I have in the whole system and it took all night to drain and refill a bunch of times in Mock-up to get them to stop leaking...
here's the bummmer...I got them to seal by turning them around with the nut outside the sump...and when I moved the stand into the only relativly level area in the garage I found the W/D platform will not fit underneath the stand because of the back cross brace....DAM MAN!!...So it's 2, actually 4 1.5" new Bulkheads that are keeping me from being able to fill and test the system with the tank...

Oh well, slow down go faster, hurry up and wait...;)
 
Can't you just turn the whole thing around and have the cross brace at the front?
 
Yanbbrox;2958714; said:
Can't you just turn the whole thing around and have the cross brace at the front?
That hole isn't needed...It came with the Sump so I just removed the hole...no problem now...the plumbing is proving to be very tight...all my cuts have to be dead on for aligment and that means they have to go all the way on to get the measured lenght and angle...
Pix tonight...
 
zennzzo;2959092; said:
That hole isn't needed...It came with the Sump so I just removed the hole...no problem now...the plumbing is proving to be very tight...all my cuts have to be dead on for aligment and that means they have to go all the way on to get the measured lenght and angle...
Pix tonight...
IC good luck on the precision.

BTW it's tonight here:popcorn:
 
Yep, sounds like some scrap pieces and some weld-on are in order.
 
here's the bummmer...I got them to seal by turning them around with the nut outside the sump...and when I moved the stand into the only relativly level area in the garage I found the W/D platform will not fit underneath the stand because of the back cross brace....DAM MAN!!...So it's 2, actually 4 1.5" new Bulkheads that are keeping me from being able to fill and test the system with the tank...

Damn B, we didn't think about that when we had the sump running on top of the stand. :(

How much clearance do you need to be able to clear the back rail? Can you minimize or modify the platform(s) the wetdry is on? What if you change out the bulkheads w/ shorter ones??... We'll get that squared away tho, shouldn't be too much of a problem.

Other than that bro, Filtration system looks PIMP! Love the clear tubing you used on the return pipe. Plus all the other nick-nack precision tuning details stuff you have planned for this badboy!! :popcorn:

Straight Up... 'OVERHAULIN' ... by Chip Foose' style!! :D :headbang2
overhaulin.jpg
 
Back
Top