Well, I picked up the sink from Pharaoh last night. We discussed where to place all these tanks with our ladies. WE GRINNED ear to ear, they rolled their eyes.
This morning at 8 am, we began plumbing the bathroom. We added a lowboy 28 gallon hot water heater for the 1/2 bath. Which is really to power the fishroom sink for water changes! We got all the plumbing, both sinks, the toliet, grinder, and insulation in. Just have to mount sink and trim bathroom and finish painting. Tuesday all will be done, but painting. Then I will have more time to help with the 500. We will trim out the 1 120s soon, and setup a tank at Pharaohs. After that, we will finish the basement at his place. Then the 500 will be put back together!!!! I will post pictures after tuesday.