Mike and I got a few things accomplished this weekend.

1. We finished off the remaining drywall pieces to be installed.
2. We finished installing and verifying the electrical. I have POWER!!!!!
3. We built stands for the two 55s that will be going in the fish room
4. Emptied and cleaned a 30 that will be made into a sump.
5. Took the 75 outside and rinsed it to get ready to start the planted tank upstairs
6. We also made sure to play a little Halo 3 in between jobs.

Here are a couple quik shots.

0613091525.jpg

0613091525a.jpg
 
You guys are doing an awesome job, keep up the good work! Im envious, my planted tank is doing alright but could be better.
 
Thanks for the help Mike!
 
^^up 5, and yet again my Xbox has died from the RROD, no halo for me :-(

Nice work guys, enjoy the cooking.
 
Pharaoh;3203922; said:
Mike and I got a few things accomplished this weekend.

1. We finished off the remaining drywall pieces to be installed.
2. We finished installing and verifying the electrical. I have POWER!!!!!
3. We built stands for the two 55s that will be going in the fish room
4. Emptied and cleaned a 30 that will be made into a sump.
5. Took the 75 outside and rinsed it to get ready to start the planted tank upstairs
6. We also made sure to play a little Halo 3 in between jobs.

Here are a couple quik shots.
Nice work... you have AC you lucky dawg...:cry: :cry: :cry:
 
zennzzo;3208034; said:
Nice work... you have AC you lucky dawg...:cry: :cry: :cry:

Yeah, but it still gets a bit hot down there.:D
 
Well, we got a little work accomplished at Mike's today, but he has the pics on his camera, so we'll have to make him post them up.
 