Thanks Zen, good weather forecast for the next few days, hope it all stays good till I'm next off. Next plan is go get the drain concreted in and then the other side of collar. Should be doable in my next block offzennzzo;2120826; said:Heck YEAH!!
Give this guy some sunshine and he can get some stuff D O N E!!
With that pesky concrete you can never have enough bracing...
Good work Bro, it looks like it's gonna be fine on the level...
Glad you editedmike dunagan;2120863; said:so... too wet... I was hoping for more....
Sorry if the progress is not fast enough the clue is in the thread title By hand mixing the concrete I've saved £200/$400 so yes it does take time but the air pump alone for this beast is £300/$600 so every saving counts, even if mean slower progress.
The fiddly bits(time consuming bits) are a pain but if done right should mean a lot of progress in a little space of time
Enjoy the popcorn!