They started putting the steel frame work for a place to enjoy the pool/pond while its raining. Remember it rains about 7 months out of the year around here.
They started with the grass. So we can finally clean up some of this mud around here.
They made good use out of the sanitary tubing that I bought by mistake. I needed pressure tubing. They used it for the molding around the edge so that the waves curl back into the P/P.
All of the little nook and crannies to plant things in need to have a top drain back into a soil area so that the dirt doesn't run into the P/P. The over flow will run back into the garden area when it rains hard.
This time I think we beat the leak pretty good. We'll see tomorrow when we fill-er up.
By the time I got home they had already done the barrel filter with the air manifold and filled it up with rocks. I hope they did it right. At least when I blow down the tube a bunch of bubbles come up through the rocks. Yippy! I did see that we didn't make an outlet for the dirty water though. And they sided the barrel up with concrete. This should be interesting. If worse comes to worse it goes back into the pool and I clean it out through the bottom drains.