Very close to being done. Have water in it now, had some leaks in the PVC that we had to fix but the pond itself is holding without any leaks. Waiting on some epoxy to cure that we had to use to fix one of the leaky PVC parts that could not be replaced, then we should be operational. Hopefully have some pictures of it filled and running tomorrow.