4300 Gallon Plywood Build (3600+ Take 2)

  • We are currently upgrading MFK. thanks! -neo
Status
Not open for further replies.
:duh:Me too:duh:Me too!!
I wasn't even thinking about April Fools day...
I just got this lump in my throat and thought of the bureaucratic BS
I have had to wade through in the past...
Musta leap-frogged my Prozac!
Pete, I bet you're sittin back reading all these posts, and ROFLMAOing
 
If it is true, that sucks! If he pulled one over on us, Pete sucks! :)

I have put up with enough bureaucratic BS that I took the bait real quick. Just waiting for him to real me in. :popcorn:
 
I read his initial postand went Aww Sh** then I realized the date. I thought it odd the terminology buteverywhere doesthings different. hereit wouldbea stopwork order followedby an engineers review
 
greengiant;4034925; said:
I read his initial postand went Aww Sh** then I realized the date. I thought it odd the terminology buteverywhere doesthings different. hereit wouldbea stopwork order followedby an engineers review
And in NO LA. you'd think they'd be overloaded with "other" type building inspections...everybody must be building or re-building something...
 
Status
Not open for further replies.
MonsterFishKeepers.com