Here is what I got done today. I finished 99.9% of the plumbing for the back of the tank, both the pump and drain lines.
I also finished up the drip/water change system by adding in the regulator and hooking up the chloramine filter.
I also whipped up a fun DIY overflow which I will post in the Ghetto DIY thread. LOL
One pic is with Mike on a step stool so you can visulaize how tall this setup really is.
I also finished up the drip/water change system by adding in the regulator and hooking up the chloramine filter.
I also whipped up a fun DIY overflow which I will post in the Ghetto DIY thread. LOL
One pic is with Mike on a step stool so you can visulaize how tall this setup really is.