I just ordered the DCT6000, eshopps pf800, filter socks, and some cheap crappy return nozzle.
Gonna use eggcrate to make the sock holder.
all I need now is the plumbing. Unless I missed something.
As for plumbing
1 length of 1 inch pfc and 1 of 3/4
Cement
1 valve
1 or 2 ball valves (needed ?)
1 gate
unions - not sure how many I'm thinking 1 near the return nozzle for when I have to dismantle the system, 1 at the pump, one near the filter sock so I can easily disconnect it to clean the sock. the over flow comes with a bulk head but do I need a union at the over flow too ?
a few 90 degree elbows....
anything else ?
Some questions about installing the plumbing.
gluing each side of the unions to the pipes but is it ok to just hand tighten the unions ?